This week in lab, the team worked on some more testing and the construction of our final iteration of the heat pipe. A specially designed bushing had to be machined to accept the threads of the 1/8" NPT ball valve. This bushing was then soldered into the copper tube.
Another angled test of Prototype 2 was conducted to compare the results from the previous tests. The data is shown below:
The graph of this data is shown below:
The fluctuation of T1(the temperature at the evaporating end) may be partially due to experimental error. Otherwise, this prototype performed as expected.